Thanks: 0
Likes: 0
Results 1 to 10 of 14
Thread: allgie
Threaded View
-
10-18-2011, 10:12 PM #7
Clarifying the Toledo Story
It is agreed and true that Toledo is one of many serious sources, but not accurate that nothing is being done and not true that EPA is looking the other way. In 2002, after being sued by US and then Ohio EPA (under basis of 1972 Federal Clean Water Act), Toledo signed a consent decree agreeing to a $500 million plan - yes that is spend $500 million on a long term control plan. The first step was doubling of their Bayview sewage plant capacity, (including a 25 million gallon holding basin for storm events) and since 2006 all flows reaching that plant have been treated. They have 25 separate projects on line in the plan. 8 are today under construction, 7 are in design phase, the rest are scheduled in the consent decree signed by the city, EPA, and the courts. The schedule for the rest requires completion within the next 9 years. True, not overnight, but then 60% of remaining projects are started or in design, and $500 million ain't chicken feed. So it is inaccurate that they and EPA aren't doing anything on that part of the problem.
All the details and facts are available for the looking at:
http://www.toledowaterwaysinitiative.com/about/






Reply With Quote
Brawl is 20 days away fishing is...
Fall Brawl quiet?