Hey Joe we usually run 27lb leadcore and 50 to 75 ft leaders it just gives good action oyhers run less but its how i was shown so i stick with what works. The knot is an insertion knot peel back about 6 inches of the sheathing on leadcore snip out the lead and make one loop in that line and roll it up out of the way a little. Then insert mono till it touches lead inside sheath and roll loop back down to about an inch from the end of sheathing and pull it tight. Swivels are torpedo brand.





Reply With Quote
just as the net was unstuck. All pop up cleats were then checked and put to their down position. Too late. We were on the line west of Pt. Abino. But as a good captain I take all responsibility for my crew and their actions. ALTHOUGH I did not put the fish on the stringer or was the one with the net.
