
Originally Posted by
joes spot
i am putting a lead core outfit together what lb lead core do most of you guys use/ length of mono/swivel or knot to mono thanks joe
Hey Joe we usually run 27lb leadcore and 50 to 75 ft leaders it just gives good action oyhers run less but its how i was shown so i stick with what works. The knot is an insertion knot peel back about 6 inches of the sheathing on leadcore snip out the lead and make one loop in that line and roll it up out of the way a little. Then insert mono till it touches lead inside sheath and roll loop back down to about an inch from the end of sheathing and pull it tight. Swivels are torpedo brand.
Prostaff Ultimate Outdoors of WNY