Quote Originally Posted by wajski View Post
Stop buy Thursday talked to a worker he said 1-2 weeks before pilings are puled they have to move barge from another job. From the top of the ramp to blacktop was poured and covered.
Poured and covered? Did they make the turnaround area concrete rather than asphalt?