Results 1 to 9 of 9

Thread: Catabwa launch

  1. #1
    Join Date
    Jan 2015
    Location
    North West Ohio, Allen County
    Posts
    208
    Images
    19

    Default Catabwa launch

    Hey there Gang. I've been out chasing whitetails so I have been away from the forum for a bit. Just wondering if anyone had some info regarding the Catabwa launch. I realize that docks may not be there. Thanks for any info!

    Kent
    PimplePounder

    Ranger Cherokee 237 18ft.
    115 HP. Johnson SPL
    15 HP Merc. Kicker
    Xi5 Motorguide Auto Anchor/GPS
    FL-20 Vexilar
    898 HD DI SI Humminbird GPS
    Navonics Premium

  2. #2

    Default

    Catawba ramps are closed (supposedly) until Dec 1st. There is currently a bunch of heavy equipment in place and a temporary wall to keep the water out while the ramps are being replaced. Given the amount of work being done, I have my doubts if it will be complete by Dec 1, but anything is possible.

  3. Default

    I saw a load of concrete insulating tarp being delivered today. I also saw them getting another rerod ready for concrete looks like some concrete will be poured soon.

  4. #4
    Join Date
    Jan 2015
    Location
    North West Ohio, Allen County
    Posts
    208
    Images
    19

    Default

    Hey you guys, thanks for the updates. Im thinking spring for this launch.. I appreciate your information...!

  5. #5

    Default

    I took this photo on November 5th....they hadn't poured the concrete yet. Now, with this cold...who knows when it will get done.
    Attached Images Attached Images  
    Captain Julia "Juls" Davis
    [email protected]
    www.julswalleyefishingadventures.com
    https://www.facebook.com/JulsWFA?ref=br_rs
    2019 Ranger 621 FS rigged with a 300 Evinrude G2
    (2) Humminbird Helix 12 SI CHIRP Mega Imaging Gen2
    Minn-Kota Ulterra 112 w/iPilot LINK
    Specializing in 1-3 person walleye and perch charters

  6. #6
    Join Date
    Jan 2015
    Location
    North West Ohio, Allen County
    Posts
    208
    Images
    19

    Default

    Thanks Capt. Juls !

  7. #7

    Default

    Looking at that pic there is no way it will be finished any time soon! Id hope it would be done by spring!

  8. Default

    Concrete was being poured on Friday. They are moving right along. I'll check it out Monday and give an update.

  9. Default

    Guard post being poured re rod is being laid also looks like they might try to pour next week

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •